Mon Oct 22 17:06:24 EDT 2007 Today (22 Oct 2007) the current info about the RAM cluster state
has been presaented on the group meeting [ PPT].
Mon Sep 17 17:10:22 EDT 2007 Today (17 Sep 2007) the info about the computing cluster
at Nuclear Chemistry Group has been presened on the group meeting [ PPT].
Wed Sep 5 10:03:03 EDT 2007 As you kow we have got 9 another machines (DELL).
One of them is already in rack and under testing.
A.S.
Wed Sep 5 10:00:01 EDT 2007 Yesterday I and Paul checked the tape drives in our Tape Library System. All
drives were up and runnig well. That means our backup scheme is runing.
A.S.
Thu Feb 23 02:49:42 EST 2006 The poster on CHEP-2006 (13-17 February, 2006, Mumbai, India). Poster title
"Midrange computing cluster architectures for data analysis in High Energy Physics"
[pdf].
Thu Feb 23 02:47:23 EST 2006 Preliminary version for remote console (it creates infrastructure for remote
administration)
[pdf].
Thu Sep 15 08:41:23 EDT 2005 Preliminary version of of new upgrade of the cluster
[pdf].
Mon Aug 8 15:17:35 EDT 2005 Preliminary version for quick description of the cluster
[pdf].
2-June-2004 The Web server was moved from previous location to "http://ram3.chem.sunysb.edu/ramdata".
Now main idea was to move everything into Linux, Apache, Wilma, etc (i.e. to move all the stuff to standard
solution where used maily standard de facto components.
Moving the Web stuff was performed by Anatoly Oreshkin.
His presentation is available at ftp://ram3.chem.sunysb.edu/pub/presentation/ramdata-web.ppt.
21-May-2004 It was placed the order of new server for the cluster RAMDATA.
17-Februaty-2003 The set of Globus scripts adopted to SUNY is available here
[gsuny.tar.gz].
22-November-2002 NCG group presentation replication business in Globus context
(pdf).
22-July-2002 Emergency instruction for RAM during time when computer expert is far from here
(pdf).
19-June-2002 Draft version for nearest plan on Globus toolkit on RAM
(pdf).
30-May-2002 Draft version for the technical report on Globus toolkit on RAM
(pdf).
29-May-2002 Draft version for tutorial on Globus toolkit is ready.
(ps,
pdf).
30-Apr-2002 The presentation on transition to RH-7.2 took place at Chemistry building 30 April 2002, 11am.
(ps,
pdf).
23-Apr-2002 The draft for group presentation about the transition
to RedHat 7.2 is available here
20-Apr-2002 The RAMDATA was moved to RedHat-7.2 and /afs directory
tree was replicated.
19-Nov-2001 The Facility is dead-sick. Please, expect reboot, job
flush etc ... at any time until new announcement.
02-Dec-2001 All Clients updated with a newer ssh version. ssh1
is being phased out.
25-Nov-2001ram24 and ram31 are back. All
clients appear to be functional. However, there is still a remaining
configuration problem which will be addressed later. Expect reboots
on week-ends.
20-Nov-2001 Most Clients back on. Configuration still considered
as volatile and not guaranteed. Expect un-announced reboot on the clients.
09-Aug-2001 Some time ago we with Jerome Lauret have submitted the abstract on CHEP2001. The draft for
the more or less full text is available
here
09-Aug-2001 It was installed new version of gcc. Now gcc gives followed answer
on the command
gcc --version
2.95.3
08-Aug-2001 All Linux machines were upgraded in memory. Now each machine has 512 MB of main memory instead
256 MB in the past.
08-Mar-2001qsub -I will now propagate the DISPLAY
variable if defined.
01-Feb-2001The RAMData facility is now on i2net network.
20-Dec-2000pgf90 and pgf77 installed on the
Linux nodes. Mildly tested, please report if you find any problems.
06-Dec-2000ROOT software has been updated to version
2-2.15 on ram0. Linux node will be auto-updated when BNL will
do the switch (apparently soon and after testing).
04-Dec-2000Small RAID access problem occured today from 13h15 to
14h30 ... I decided it was best to put the /Data partition offline
(without advance warning, sorry) to make the proper repair.
15-Nov-2000 PBS queues reshape. Please, see front page for details.
10-Nov-2000ram14 back online. Motherboard replaced.
02-Nov-2000ram26 restored and back in the facility.
01-Nov-2000Compaq technician came today. The one IOD board
was also replaced.
24-Oct-2000Compaq was contacted in relation with the ECC
memory corruption occuring on the server. After investigation,
they have decided to send a technician on site. The CPU board was replaced.
14-Oct-2000 ram0 had a serious backup database corruption problem
and was down for about 2 days for recovery. Now restored.
29-Sep-2000 More swap space have been added to the server. Patches
applied as well + some performance issue adjustement have been applied.
28-Sep-2000 Quota increased again by 30%. Should be more than
adequate now.
24-Sep-2000 Printing works from all nodes.
22-Sep-2000 Email was setup yesterday on all ram-Linux nodes.
29-Aug-2000 MySQL client installed on all Linux box.
25-Aug-2000 All user's quota have been increased by a factor of 5.